You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Jakbar Betonisasi Jalan Rusak di Lima Kecamatan
....
photo TP Moan Simanjuntak - Beritajakarta.id

West Jakarta Bina Marga Sub-agency Concretes Road in Five Sub-districts

West Jakarta Bina Marga Sub-agency is about to concrete the roads in five sub-districts this year.

each sub-district has four to five points

West Jakarta Bina Marga Sub-agency Head Darwin Ali, said his side submitted budget to concrete the roads in Tambora, Kembangan, Cengkareng, Kebon Jeruk and Kalideres.

"The concreting is run because the road section was damaged. The average length of the concreted road section is 500 meters where each sub-district has four to five points," he said, Wednesday (9/11).

7,203 Potholes in North Jakarta Repaired

Darwin added that the thickness of the concreted road sections is 20 centimeters and the work has been carried out since two months ago, such as on the Outer Ring Road Rawa Buaya (Cengkareng) and Jalan Pangeran Tubagus Angke (Tambora).

Ali Rahman (53), resident of RT 02/05, Rawa Buaya Urban Village, appreciated and supported this project. Moreover, the project is run in his residential along 150 meters, or precisely in front of Rawa Buaya Flat.

"The road becomes safer to be crossed," he admitted.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye948 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye929 personFolmer
  4. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye808 personBudhi Firmansyah Surapati
  5. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye769 personAldi Geri Lumban Tobing